Multifoil Insulation Coupon Code

Fast Next Day DeliveryFast Next Working Day Delivery

Bulk Discounts AvailableBulk Discounts Available

Fast Next Day Delivery Order Pre 2pm for Delivery

How to Fit SuperQuilt onto Solid Walls

Difficulty: Easy • 5 Steps

This How-To-Guide will display how to install SuperQuilt on the internal of Solid Walls.

SuperQuilt is BDA and BBA certified for use in Solid Walls. Our Multi-layered blanket is popular in both refurbishment projects, and also new builds.

SuperQuilt is proven to save cost, space, wastage & installation time compared to Rigid PIR Insulation (Kingspan / Celotex

Require a U-value document for building control? Visit our free & easy to use Online U-value Calculator. Receive instant solutions in less than 60 seconds! Click Here to Use!

SuperQuilt-Insulation are the leading UK & European distributor of Multifoil Insulation products. We offer fast next working day delivery to the UK Mainland (Order before 2pm)

Method Steps

  1. Install Timber Battens

    Start by installing treated timber battens directly onto your solid walls. We advise the spacing's to be between 400mm & 600mm centres. Usually the thickness of the battens required are 25mm however this will depend on your desired U-value. To find the recommended batten depth for your project, visit our Free to use Online U-value Calculator.

  2. Staple SuperQuilt

    Next, staple SuperQuilt onto the first set of battens, then roll out SuperQuilt horizontally. We recommend the use of 14mm staples when fixing SuperQuilt. Multifoil-Insulation's Fitting Kit includes a Heavy Duty Staple Gun & 5,000 14mm Staples. SUperQuilt can be easily cut using our Multifoil Scissors, available on our website.

  3. Overlaps & Sealing

    Overlap SuperQuilt by a minimum overlap of 50mm. Tape and Seal SuperQuilt using ThermaSeal Foil Tape. We recommend sealing all overlaps, joints and the perimeter to ensure a complete seal. This will eliminate the risk of condensation.

  4. Install Counter Battens

    Once SuperQuilt is fully installed and covered, install counter battens over SuperQuilt. We recommend to create a frame around any windows, and around the perimeter. Thickness of batten will depend on desired U-value. To find the recommended batten depth for your project, visit our Free to use Online U-value Calculator.

  5. Installing Plasterboard

    The plasterboard is then screwed into the battens in the usual manner. When SuperQuilt is installed as the most internal insulation layer, there is no requirement for a foiled-back plasterboard. SuperQuilt will work as a high performing Vapour Control Layer, when taped and sealed using Thermaseal Foil Tape. Optional Insulated Plasterboard's can be used for extra thermal benefits and to reach a lower U-Value.

Buy Tools & Materials

Disclaimer – SuperQUilt-Insulation cannot be held responsible for any losses financially or physically from advice provided in this How-To-Guide.

Installation of SuperQuilt Insulation for Solid Walls should be in harmony with the official certificate. Recommended fixing materials and good building practice should also be used.

trending_flatBack to All Guides
MultifoilsDirect.co.uk Logo