How To Install YBS BreatherFoil FR onto the external of Timber Frame Walls.
BreatherFoil is the higher performing alternative to Reflex, TF200 and Reflectashield.
This product is BDA KIWA certifed for use with Building Control and can be purchased online via our website, at the lowest trade rates.
multifoilsdirect.co.uk are the leading UK distributor of Multifoil Insulation products. We offer fast next working day delivery to the UK Mainland (Order before 2pm)
view_day Insulation Materials
build Tools
Method Steps
-
Preparing the Building
Prepare the BreatherFoil by removing any exisiting Cladding on the external of the walls, exposing the OSB / Sarking Board.
-
Stapling the BreatherFoil
Staple the BreatherFoil directly to the external timber boarding, at a minimum of 300mm intervals.
-
Vertical Joints
Vertical Joints; ensure a minimum overlap of 100mm & seal using ThermaSeal Foil Joining Tape.
-
Horizontal Joints
Horizontal Joints; ensure a minimum overlap of 75mm, leaving the overlaps untaped.
-
Stapling the Second Layer of BreatherFoil
Staple the BreatherFoil directly to the external timber boarding, at a minimum of 300mm intervals.
-
Sealing the Perimeter
Seal the vertical perimeter using ThermaSeal Foil Tape, leaving the top and bottom untaped.
-
Installing Battens
Apply a layer of timber battens (minimum of 25mm), perpendicular to the rafters at minimum intervals of 400mm.
-
Installing External Cladding
Finally apply the external finish in accordance with the manufacturers certification, fixing instructions & good building practice.